0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Bridge E-8 in the New Railroad of High Velocity to the Northwest of Spain

 Bridge E-8 in the New Railroad of High Velocity to the Northwest of Spain
Auteur(s):
Présenté pendant IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, publié dans , pp. 39-44
DOI: 10.2749/222137809796067740
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.13 MB

During the years 2001 and 2007 it has been constructed in Spain the new railway line of high speed, that connects Madrid with the north and northwest of Spain.

This paper exposes one of the m...
Lire plus

Détails bibliographiques

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Publié dans:
Page(s): 39-44 Nombre total de pages (du PDF): 6
Page(s): 39-44
Nombre total de pages (du PDF): 6
Année: 2009
DOI: 10.2749/222137809796067740
Abstrait:

During the years 2001 and 2007 it has been constructed in Spain the new railway line of high speed, that connects Madrid with the north and northwest of Spain.

This paper exposes one of the more singular bridges in the area near to Madrid between the kilometre points 104+800 and 108+832 including the project and the construction of the bridge E-8, called in Spanish “in pergola”, over the existing railways that connects Madrid with the city of Alcobendas and Madrid with Segovia in the north of Spain.

The project of the bridge was realized by means of a three-dimensional finite element model made with the program SAP2000N that includes all the elements of the structure.

The project of the bridge was realized during the year 2004 and the construction of it during the years 2005 and 2006. Finally during years 2006 and 2007 was made the construction of the superstructure (railways, catenaries, etc) and put in service to the public the 23rd of December of 2007.

The construction was realized without stopping the traffic of the existing trains from Madrid to Alcobendas and from Madrid to the north of Spain.

Mots-clé:
pont fondation culée tablier